DUNARROW

Dunarrow Architects for homes, public rooms and buildings worth keeping.

A studio of 6 in Glasgow. We design houses and co-operative housing, public buildings for councils and trusts, and new lives for old warehouses and tenements, across the west of Scotland.

  • ARB-registered
  • RIAS Chartered Practice
  • 41 buildings since 2016
  • Two RIAS awards

6 of our projects. Drag or scroll sideways.

Houses, libraries and the warehouses we did not knock down

Nine projects from the last nine years, built, on site and one that never was. Every one with its floor area, cost and the team who drew it.

All 9 projects

The studio

Why do we draw the section first?

Because every hard question about a building is vertical: head height under a beam, where the water goes, where the February sun lands. A plan shows a decision already made. A section is where it is still open, and where a client who has never read a drawing can see it.

Buildings
41
People
6
Since
2016
Meet the studio
A studio desk with a black lamp, white card models, sketchbooks and printed plans on a concrete floor

Three weeks from your first call to a written answer

Before any fee is agreed you get a site visit and a feasibility note for a fixed £450, credited against the fee if you go ahead.

  1. You send the address

    Through the brief form or a phone call. We reply within two working days, including when the answer is no.

  2. We walk the site

    Two hours with a tape and a camera. For an existing building we measure the rooms that matter.

  3. You get it in writing

    A feasibility note inside three weeks: what the site allows, what it will roughly cost, what to watch.

  4. We agree the fee

    A one-page fee letter, a fixed sum per stage. You sign one stage at a time.

Tell us what you are planning

Pick the closest match and the brief form opens with it filled in. You will be asked about the site, the size, the budget and when you want to start.

What the fee pays for, stage by stage

You commit to one stage at a time, at a fixed sum agreed before it starts. Planning and warrant fees, engineers and surveys are listed separately in the fee letter.

Services, fees and worked examples
Architect's fee by work stage
Stage What you receive Typical duration Share of fee
Brief
  • Measured survey of the site or building
  • Written brief and area schedule
  • Order-of-cost estimate
2–3 weeks
Concept
  • Two or three design options
  • Plans, sections and a simple model
  • Updated cost estimate
4–6 weeks
Planning
  • Planning drawings and design statement
  • Submission and case management
  • Listed building consent where needed
8–14 weeks
Technical
  • Building warrant drawings and specification
  • Coordination with engineers
  • Tender package for three to five builders
8–12 weeks
Construction
  • Contract administration
  • Fortnightly site visits and reports
  • Valuations, snagging and completion certificate
Length of the build
Total Usually 9–13% of the construction cost, agreed as a fixed sum per stage.

What clients said once the keys were handed over

Housing co-operative · Kelvinhaugh Court

“Three firms told us the yard could not be built on without tanking it. Dunarrow lifted the floor 900mm and let the water come and go. Two winters in, nobody has had wet feet.”
Morag KerrChair of the building committee
See Kelvinhaugh Court

Private developer · Gallowgate Works

“We came in with a demolition price. We left with a costed case for keeping the building that was £310,000 cheaper, and the tenants moved in four weeks earlier than the new-build would have allowed.”
Iain BuchananDevelopment partner
See Gallowgate Works

Private client · Ardentinny House

“The fee for every stage was on one page before we signed anything, and it did not move. The architect who measured the plot was the one who signed off the last snag.”
Ruth and Calum FraserHomeowners
See Ardentinny House

Asked at every first meeting

How much does an architect cost?

For most of our work the full fee is 9–13% of the construction cost, split by stage so you only commit to one stage at a time. A house extension costing £150,000 to build typically carries a fee of about £16,500. Our first step is always the fixed £450 site visit and feasibility note.

Do you take on small projects?

Yes, from about £60,000 of building work. Below that a good builder and a structural engineer are usually better value than an architect, and we will tell you so at the site visit.

How far do you travel?

Anywhere inside the central belt is included in the fee. Beyond it we charge travel at cost, and we do not take work we cannot reach inside a day.

How long does planning permission take in Glasgow?

A householder application is decided in eight weeks on paper and ten to fourteen in practice. Listed building consent and conservation area work run longer. We programme for the realistic figure, not the statutory one.

All questions

£450 buys a site visit and a written answer.

Send us the address. We walk the site, measure what matters and write back inside three weeks with what it allows and what it will cost. We reply to every enquiry within two working days.